GEB 11.1V 3S 2200mAh 45C High-Discharge LiPo Battery for RC Airplanes & 450 Helicopters

Benchmark 11.1V 3S 2200mAh 45C LiPo battery pack (24.4Wh, 185g) with XT60 connector for RC airplanes, warbirds, and 450-class 3D helicopters.

B2B Engineering Review & Pricing

Direct manufacturer supply, custom BMS telemetry, and CAD fit validation for OEM/ODM projects.

✔ Response target: Target response within 12 business hours during business hours; timing varies by inquiry complexity and working hours.
✔ Typical Lead Time: 7–10 business days for prototypes; 15–20 business days for mass production after final specification approval. Final timing is confirmed after tooling, testing, and order review.
✔ Shipping documentation: Applicable UN38.3 test documentation, MSDS/SDS, CE and Class 9 dangerous-goods requirements are confirmed per selected configuration and shipment.

Product Details

Direct Answer / Engineering Summary

The GEB 11.1V 3S 2200mAh 45C High-Discharge LiPo Battery Pack is the industry-standard benchmark battery for RC fixed-wing trainers, park flyers, warbirds, and 450-class 3D helicopters (Align T-Rex 450, Blade 450). Delivering 11.1V nominal voltage (3S1P) and 2200mAh (24.42Wh) capacity with a true 45C continuous discharge (99A) and 90C burst, this pack balances flight duration and agile wing loading.

Engineering Overview

Product Overview

Featuring precision-matched internal resistance across all three cells (ΔR ≤ 0.3mΩ), the GEB 3S 2200mAh pack maintains crisp cyclic response during aggressive aerobatics. Equipped with 12AWG silicone leads, a factory XT60 plug, and a JST-XH balance connector, it offers universal compatibility.

Critical Parameters

Key Commercial & Electrical Facts

Feature Technical Specification
Nominal Voltage / Cell Count 11.1V (3S1P LiPo / 3.7V per cell)
Rated Capacity & Energy Output 2200mAh (2.2Ah) / 24.42Wh
Continuous / Burst Rate 45C Continuous (99A) / 90C Burst (198A, ≤ 5s)
Physical Dimensions 106.0 × 34.0 × 24.0 mm (±1.0mm)
Net Pack Weight Approx. 185 g ± 5 g
Connectors 12AWG Silicone Leads + Amass XT60 + JST-XH 4P
Cycle Endurance ≥ 300 cycles (@ 80% DoD, 1C charge / 5C discharge)
Engineering Data

Technical Specifications

Parameter Value Test Conditions & Tolerances
Full Charge Cutoff Limit 12.60V (4.20V ± 0.02V per cell) CC/CV standard balance protocol
Discharge Cutoff Floor 9.00V (3.00V per cell) Recommended landing alarm: 3.60V/cell
Internal Resistance (1kHz AC) ≤ 4.5 mΩ total pack Measured at 25°C 100% SoC
Operating Temperature Envelope Charge: 0~45°C | Discharge: -10~60°C UN38.3, MSDS, CE certified
Engineering Validation

Equipment Compatibility & Engineering Fit Check

Before deploying GEB 11.1V 3S 2200mAh 45C High-Discharge LiPo Battery for RC Airplanes & 450 Helicopters, verify these verified electrical and mechanical boundary requirements:

☑
Voltage & Charge Cutoff: Nominal 11.1V (charging CC/CV cutoff at 12.6V); confirm charger algorithm strictly matches this chemistry.
☑
Capacity & Energy Budget: Rated at 2200mAh; verify system run-time calculations under planned discharge currents.
☑
Physical Envelope: Specified at 106 × 34 × 24 mm (±1.0mm); allow expansion clearance and wire bend radius inside the device compartment.
☑
Cycle Reliability: Verified for ≥ 300 cycles (80% DoD @ 1C/5C) under controlled DoD and thermal management.
💡 Custom Engineering Fit: Contact our Shenzhen engineering team to verify CAD models, custom wire leads, or system integration specs for this product.
Operational Suitability

Operational Boundary Conditions

✔ Recommended Fit & Use Cases:

  • Industrial UAVs, FPV platforms, and robotics requiring rapid burst response at 11.1V.
  • Flight missions needing high energy density and stable voltage plateaus under heavy payload draw.
  • Applications demanding verified Class 9 / UN38.3 compliance for commercial field logistics.

⚠ Operational Constraints & Limits:

  • Do not discharge below minimum cutoff voltage or charge beyond 12.6V.
  • Maintain operational surface temperature within -20°C to +60°C discharge (0°C to +45°C charge).
  • Ensure connector polarity and pin assignment match system schematics prior to initial power-up.
First-Party Standards

First-Party Manufacturing SOP & Export Compliance

🏭 Automated Grading & Matching Cells classified via automated OCV/ACIR sorting (ΔV ≤ 2–3mV, ΔR ≤ 1.2mΩ) for tight electrochemical balance.
🔬 Joint Integrity & Testing Laser or ultrasonic busbar/tab welding with destructive pull test validation ≥ 5.0–8.0 kgf per terminal.
📦 Full Cycle Aging Verification 100% full charge-discharge cycle screening and thermal imaging prior to warehouse dispatch.
🌐 Export & Regulatory Clearance Supplied with certified UN38.3 test summaries, MSDS, 1.2m drop reports, and Class 9 DG shipping documentation.
Turnaround: 7–10 days prototypes; 15–20 days mass production per custom tooling requirements. View Verified Manufacturing Equipment & Testing Facility →

⚙ Engineering FAQ & B2B Procurement Specifications

Can GEB 11.1V 3S 2200mAh 45C High-Discharge LiPo Battery for RC Airplanes & 450 Helicopters be supplied with a pre-installed PCM, NTC thermistor, and wire connector?
Yes. While supplied as a bare Grade-A cell by default, GEB provides turnkey custom termination including Seiko/ichi-grade protection circuit modules (PCM), 10kΩ/100kΩ NTC thermistor leads, and genuine JST, Molex, or custom wire harnesses.
How does GEB ensure batch consistency for multi-cell series/parallel pack assembly?
Every production batch undergoes 100% automated OCV, AC internal resistance (1kHz ACIR), and capacity grading so cells shipped in the same lot maintain tight voltage and impedance matching.
Does GEB provide UN38.3 test summaries, MSDS, and Class 9 dangerous goods export compliance?
Yes. General Electronics Technology (GEB) supplies complete first-party compliance documentation including UN38.3 test summaries, 1.2m drop test reports, MSDS/SDS sheets, and certified IATA/IMDG Class 9 dangerous goods packaging.
What is the turnaround time and MOQ for custom cell terminations or pack assembly?
Standard bare cells or custom PCM/connector prototypes ship within 7 to 10 business days after drawing confirmation, with mass production turnaround of 15 to 20 business days.

Request Engineering Review & Custom Battery Quote

Submit your technical requirements, continuous/peak discharge loads, or enclosure dimensions for an immediate engineering assessment.

B2B Product Inquiry